EnerAI Dynamic Solutions

Electricity
Market Simulator

Simulate competitive wholesale electricity markets with full network physics, locational marginal pricing, and multi-participant bidding — live in your browser.

Launch Market Simulator Request a Demo
Explore

Real markets.
Real physics.
Real prices.

EnerAI's Market Simulator brings the full depth of wholesale electricity markets to your browser — the same market clearing and locational pricing that grid operators run every five minutes, now live and interactive.

Market clearing that
respects the physics.

Every auction enforces the actual physics of the grid — power balance at every bus, transmission limits on every line, and generation constraints respected throughout. No approximations, no shortcuts.

Price signals as precise
as the grid demands.

Every bus in the network gets its own Locational Marginal Price — computed with the same precision used by real-world grid operators. When transmission lines congest, prices diverge across locations, revealing the true economic cost of delivering power through constrained corridors.

Everything a market needs.
LMP
At Every Bus in the Network
Multi-Bid
Stepped Price-Quantity Offers
Live
Market Clearing in Real Time
Full
Profit Breakdown Per Participant
The complete toolkit
for market simulation.
From multi-segment generator bids to congestion-driven LMPs — everything needed for electricity market simulation, research, and education.

Precision Market Clearing

Finds the minimum-cost dispatch that meets system demand while respecting every generation limit and transmission constraint — delivering the optimal market outcome in every run.

LMP at Every Bus

Every bus receives its own Locational Marginal Price — the energy component plus any congestion premium — computed with the same precision used by CAISO, PJM, and MISO.

Multi-Segment Bidding

Generators submit stepped price-quantity bids that mirror real ISO bid formats. The market clears each segment in merit order, honoring both the bid parameters and each generator's physical operating range.

Transmission Congestion

Transmission line limits are enforced throughout every market run. When a corridor becomes constrained, prices separate between importing and exporting areas — creating the locational price signals that reflect true grid scarcity.

GENCO Profit Analytics

Per-company breakdown of cleared dispatch, bid costs, LMP revenue, and net profit — all updated after every market run. Every participant sees exactly what they earned and why.

Admin Network Designer

Administrators configure the grid topology from scratch — buses, transmission lines, generators, and loads — through a drag-and-drop visual diagram editor with real-time validation before each market run.

Three steps to a
cleared market.
1

Design your network.

Build any grid topology through the visual network designer. Set bus types, transmission line capacities, generator operating ranges, and load demands.

  • Drag-and-drop bus and line placement
  • Assign generators and loads to buses
  • Real-time network validation
  • Multiple generating companies (GENCOs)
2

Submit your offers.

Each generating company logs into the bidding interface and submits price-quantity offers for its generators. Use a single price or a full stepped cost curve — the market accepts both.

  • Simple single-price bids
  • Multi-segment piecewise cost curves
  • Physical capacity limits enforced
  • Secure GENCO account login
3

See every outcome, instantly.

The market clears and results appear immediately — optimal dispatch for every generator, locational prices at every bus, line flows across the full network, and a complete profit breakdown for every participant.

  • LMP at every bus
  • Dispatch and line flow results
  • Revenue, cost, and profit per company
  • Segment-level dispatch breakdown
"Understanding how prices form and how markets clear is the foundation of every sound decision in the modern energy sector."

— Market Simulator, EnerAI Dynamic Solutions

Ready to run
your first market?

The Market Simulator is live and waiting. Log in, configure your network, and clear your first auction today.

Launch Market Simulator Request a Demo